Metaalunie terms and conditions

We use General Terms and Conditions issued by the Koninklijke MetaalUnie, referred to as the METAALUNIE TERMS AND CONDITIONS, filed with the registry of the Rotterdam District Court on January 1, 2025.

Article 1: Applicability

1.1. The MetaalUnie member using these terms is referred to as the contractor. The counterparty is referred to as the client.

1.2. These terms apply to all offers made by a MetaalUnie member, all agreements entered into by them, and all agreements resulting therefrom, insofar as the MetaalUnie member acts as the contractor.

1.3. In case of conflict between a provision in the concluded agreement and these terms, the provision in the agreement shall prevail.

1.4. Only MetaalUnie members may use these terms.

Article 2: Offers

2.1. All offers by the contractor are non-binding and revocable, including offers with an acceptance period. The contractor has the right to revoke its offer up to two working days after acceptance has been received.

2.2. The prices stated in the contractor’s offer are in euros, excluding VAT and other government-imposed levies or taxes. The prices also exclude travel, accommodation, packaging, storage, and transport costs, as well as costs for loading, stacking, unloading, and assistance with customs formalities.

2.3. Unless otherwise specified, the offer does not include:

a. Ground, pile driving, demolition, foundation, carpentry, plastering, painting, wallpapering, repair, or any other construction work;

b. The realization of connections for gas, water, electricity, internet, or other infrastructure facilities;

c. Measures to prevent or limit damage, theft, or loss of items present at or near the work site;

d. Removal of materials, soil, building materials, or waste;

e. Vertical and horizontal transport.

Article 3: Confidentiality

3.1. All information provided by or on behalf of the contractor to the client (such as offers, designs, images, drawings, and know-how), in any form, is confidential. The client shall use this information only for executing the agreement and shall not disclose or reproduce it.

3.2. If the client breaches any obligation under paragraph 1, they shall owe an immediately payable penalty of €25,000 per violation. The contractor may claim this penalty in addition to statutory compensation.

3.3. The client must return or destroy the information referred to in paragraph 1 upon first request, within a period set by the contractor, and may not retain any copies in any form. In case of a breach, the client shall owe the contractor an immediately payable penalty of €1,000 per day, in addition to statutory compensation.

Article 4: Advice and Information Provided

4.1. The client cannot derive any rights from advice and information provided by the contractor that do not specifically relate to the assignment.

4.2. If the client provides information to the contractor, the contractor may assume its accuracy and completeness when making an offer and executing the agreement.

4.3. The contractor is not obliged to warn about or independently investigate inaccuracies in the assignment, defects, and unsuitability of items provided by the client, or errors or defects in plans, drawings, calculations, specifications, or execution instructions provided by the client.

4.4. The client indemnifies the contractor against any claims from third parties in connection with (the use of) information provided by or on behalf of the client. This includes, among other things, advice, instructions, drawings, calculations, designs, materials, brands, samples, and models. The client shall compensate the contractor for all damages incurred, including full legal defense costs.

Article 5: Delivery Time / Execution Period

5.1. All delivery times, including a delivery date, week, month, term, or execution period mentioned in these terms, are indicative. If they are exceeded, the client must always give the contractor a notice of default.

5.2. The delivery time applies only if the client and contractor have timely agreed on all commercial and technical details, the contractor has received all necessary information, including final and approved drawings, all items to be provided by the client have been received, and all agreed (installment) payments have been made.

5.3. The delivery time no longer applies if circumstances arise unknown to the contractor at the time of specifying the delivery time and which are at the client’s risk, such as order changes, additional or reduced work, or suspension by the contractor.

5.4. The client must reimburse the contractor for all costs and damages incurred due to a change in the delivery time.

5.5. Exceeding the delivery time does not entitle the client to compensation or partial or full dissolution of the agreement.

Article 6: Delivery and Transfer of Risk

6.1. Delivery occurs when the contractor makes the goods available at its business location and informs the client. From that moment, the risk transfers to the client.

6.2. If, at the client’s request, the contractor arranges or assists with transport, storage, loading, stacking, or unloading, this is at the client’s risk.

Article 7: Price Changes

The contractor may pass on any cost increases occurring after the agreement has been concluded to the client, who must pay the price increase upon first request.

Article 8: Force Majeure

8.1. If the contractor is unable to fulfill obligations due to circumstances beyond its control, this constitutes force majeure. The contractor is not liable for any resulting damages.

8.2. Circumstances considered force majeure include (civil) war, terrorism, riots, disease outbreaks and related government measures, natural disasters, extreme weather, import/export restrictions, fire, cybercrime, energy supply disruptions, theft, and supplier failures.

8.3. If force majeure is temporary, the contractor may suspend its obligations. If force majeure lasts longer than six months, both parties may terminate the agreement.

8.4. No party is entitled to compensation due to force majeure, suspension, or termination.

Article 9: Additional Work

Additional work is charged based on the contractor’s prices at the time of execution. The client must pay the price of additional work upon first request.

Article 10: Execution of Work

10.1. The client ensures the contractor can carry out work safely and without interruption. The client is responsible for obtaining necessary permits and providing access to required utilities and storage facilities.

10.2. The client bears the risk and is liable for damage, theft, or loss of items at or near the work site, unless the client proves the contractor caused the damage.

10.3. The client must adequately insure against the risks mentioned in paragraph 2 and report any damage to their insurer immediately for further handling and settlement.

Article 11: Completion of Work

11.1. The work is considered completed when:

a. the client has approved the work;

b. the work has been taken into use. If part of the work has been taken into use, that portion is considered completed;

c. the contractor has notified the client in writing that the work has been completed, and the client has not reported in writing within 14 days after this notification that the work has not been approved;

d. the client does not approve the work due to minor defects or missing parts that can be repaired or delivered within 30 days and do not prevent the use of the work.

11.2. The contractor is not obligated to provide the client with a dossier as referred to in Article 7:757a of the Civil Code regarding the completed and to be delivered building (a ‘handover or delivery dossier’).

11.3. If the client does not approve the work, they must notify the contractor in writing, stating reasons. The client must allow the contractor the opportunity to complete the work.


Article 12: Liability

12.1. If the contractor is liable for any reason, this liability is always limited as specified in the following sections.

12.2. If the contractor has any insurance that covers damages, the contractor’s liability for damage is limited to the amount paid out by the insurance in the relevant case.

12.3. If the contractor does not have such insurance or for any reason no amount is paid out under such insurance, the obligation to compensate for damages is limited to a maximum of 15% of the contract sum (excluding VAT). If the agreement consists of parts or partial deliveries, this obligation is limited to a maximum of 15% (excluding VAT) of the contract sum for the part or partial delivery related to the contractor’s liability. In the case of a continuing contract, the obligation to compensate for damages is limited to a maximum of 15% (excluding VAT) of the contract sum for the last twelve months preceding the event causing the damage.

12.4. The following are not eligible for compensation:

a. Consequential damage. Consequential damage includes, but is not limited to: stagnation damage, production loss, lost profits, missed savings and subsidies, tax disadvantages, wasted costs, internal costs of the client, reduced goodwill and reputational damage, fines, damage due to the client’s liability to third parties, damage related to the destruction, loss, or damage to data or documents, transportation costs, travel and accommodation costs, storage costs, costs for replacement equipment and labor, and costs associated with recalls;

b. Surface damage. Surface damage refers to damage caused to things being worked on or to things located near the work area;

c. Damage to or caused by equipment provided to the contractor;

d. Damage caused by willful intent or gross negligence of the contractor’s helpers or non-supervisory subordinates;

e. Damage to materials provided by or on behalf of the client, including damage due to faulty processing, assembly, or installation. The client can insure against such damages if possible.

12.5. The client indemnifies the contractor for all claims from third parties due to a defect in a product supplied by the client to a third party that includes products or materials supplied by the contractor. The client must compensate the contractor for all damages incurred in this regard, including the full cost of defense.

12.6. Any claim for compensation by the client expires after 24 months from the date the claim arises, unless the client has submitted the claim to the competent court before the expiration of that term.


Article 13: Warranty and Other Claims

13.1. Unless agreed otherwise in writing, the contractor guarantees the proper execution of the agreed performance for a period of six months after delivery, as detailed in the following sections.

13.2. If the parties have agreed on different warranty terms, the provisions of this article apply unless and to the extent they conflict with the different warranty terms.

13.3. The client must provide all necessary cooperation at no cost to allow the contractor to investigate a complaint from the client regarding the executed performance; otherwise, all the client’s rights related to that complaint will expire.

13.4. If the contractor has validly rejected a complaint about the executed performance, the client must reimburse all reasonably incurred costs for investigating the complaint.

13.5. If the agreed performance was not properly executed, the contractor will choose whether to properly execute it, fully or partially replace the delivered item, or credit the client for a reasonable portion of the contract sum.

13.6. If the contractor chooses to properly execute the performance or replace the delivered item, the client must provide the contractor with the opportunity to do so. The contractor determines the method and timing of execution. If the agreed performance involved working with materials provided by the client, the client must provide new materials at their own risk and expense.

13.7. Items repaired or replaced by the contractor must be sent by the client to the contractor. Transport, shipping, disassembly, and assembly are at the client’s cost and risk. Additionally, travel, accommodation, and travel hours are at the client’s expense. The contractor may require security or prepayment for these costs.

13.8. The contractor is only required to fulfill the warranty if the client has fulfilled all obligations.

13.9. a. Warranty is excluded for defects caused by:

  • Normal wear and tear;
  • Improper use;
  • Failure to perform or improper maintenance;
  • Installation, disassembly, modification, or repair by the client or third parties;
  • Defects or unsuitability of items, materials, or tools provided by or prescribed by the client.

b. No warranty is given for:

  • Delivered items that were not new at the time of delivery;
  • Inspection, repair, and overhaul of items;
  • Items covered by factory warranty;
  • Items for which warranty has been provided by third parties to the client.

13.10. Sections 3 to 8 of this article apply equally in the event of any claims by the client based on breach of contract, non-conformity, or any other legal basis.


Article 14: Complaint Obligation

14.1. The client may not claim a defect in the performance unless they have complained in writing to the contractor within fourteen days after discovering the defect or when they should reasonably have discovered it.

14.2. The client must, under penalty of forfeiture of all rights, complain in writing to the contractor about the invoice within the payment term. If the payment term exceeds thirty days, the client must complain in writing within thirty days after the invoice date.


Article 15: Non-Received Goods

15.1. The client is obligated to take delivery of the goods or items that are the subject of the agreement at the agreed location after the delivery or execution period has expired.

15.2. The client must cooperate at no cost to enable the contractor to make the delivery.

15.3. Non-received goods will be stored at the client’s cost and risk.

15.4. In case of violation of the provisions in sections 1 or 2 of this article, the client is obligated to pay the contractor a fine of €250 per day for each violation, up to a maximum of €25,000. This fine can be claimed in addition to damages under the law.


Article 16: Payment

16.1. Payment is made at the place of establishment of the contractor or to an account designated by the contractor.

16.2. Unless otherwise agreed, payment is due within 30 days after the invoice date.

16.3. If the client fails to fulfill their payment obligation, they are required to comply with the contractor’s request for offsetting.

16.4. The client’s right to offset claims against the contractor or suspend performance is excluded, unless the contractor is in suspension of payments, bankruptcy, or subject to statutory debt restructuring.

16.5. Regardless of whether the contractor has fully executed the agreed performance, all amounts owed by the client under the agreement are immediately due if:

a. A payment term has been exceeded;

b. The client fails to meet obligations under Article 15;

c. The client has not provided security as requested under Article 17 of these terms;

d. The client’s bankruptcy or suspension of payments is requested;

e. A lien is placed on the client’s assets or claims;

f. The client (company) is dissolved or liquidated;

g. The client (individual) requests statutory debt restructuring, is placed under guardianship, or has passed away.

16.6. The client owes interest on the overdue amount from the day after the agreed payment deadline until the day the payment is made. If no specific payment deadline is agreed, interest is due 30 days after the due date. The interest is 12% per annum, or the statutory interest if higher. A partial month is considered a full month for interest calculation, and the interest amount is increased by the interest owed for the year.

16.7. The contractor is authorized to offset debts to the client with claims from affiliated companies of the contractor. Furthermore, the contractor may offset claims from the client with debts owed to the contractor by affiliated companies.

16.8. In the event of late payment, the client is obligated to pay the contractor all extrajudicial costs, with a minimum of €75. These costs are calculated based on the principal amount according to the following table:

  • 15% over the first €3,000;
  • 10% over the next €3,000 up to €6,000;
  • 8% over the next €9,000 up to €15,000;
  • 5% over the next €45,000 up to €60,000;
  • 3% over amounts exceeding €60,000.

Actual extrajudicial costs are owed if they exceed the above calculation.

16.9. If the contractor is fully or mostly successful in a judicial procedure, all costs incurred by the contractor will be at the client’s expense.

Article 17: Securities

17.1. The Client is obliged, upon the first request of the Contractor and at its discretion, to provide sufficient security for all payments owed by the Client to the Contractor under the agreement. If the Client fails to comply within the specified time frame, the Client will immediately be in default. In this case, the Contractor has the right to terminate the agreement and claim damages from the Client.

17.2. The Contractor retains ownership of the delivered goods as long as the Client has not fulfilled its obligations under any agreement with the Contractor, including claims such as damages, fines, interest, and costs.

17.3. If the Client has fulfilled its obligations after the goods have been delivered according to the agreement, the retention of title on these goods is revived if the Client fails to meet its obligations under a later agreement.

17.4. As long as there is a retention of title on delivered goods, the Client may not encumber or transfer these goods outside its normal course of business. This provision has proprietary effect.

17.5. After the Contractor has invoked its retention of title, it may retrieve the delivered goods. The Client shall cooperate in this regard.

17.6. In case of violation of the provisions in section 5 of this article, the Client, after being notified by the Contractor, shall owe a penalty of €250 per day for each violation, up to a maximum of €25,000. This penalty can be claimed in addition to compensation based on the law.

17.7. The Contractor has a pledge and a right of retention on all goods it holds or will hold from the Client for any reason, as well as for any claims the Contractor has or may have against the Client.


Article 18: Intellectual Property Rights

18.1. The Contractor is considered the creator, designer, inventor, or originator of works, models, signs, or inventions created under the agreement. The Contractor has the exclusive right to apply for a patent, trademark, or design.

18.2. The Contractor does not transfer any intellectual property rights to the Client in the performance of the agreement.

18.3. If the performance to be delivered by the Contractor includes the delivery of computer software, the source code will not be transferred to the Client. The Client will only receive a non-exclusive, worldwide, and perpetual user license for the computer software, for the purpose of normal use and proper functioning of the product.

18.4. The Client is not allowed to transfer the license or grant a sublicense. This provision has proprietary effect. Only in the case of resale of the product associated with the delivery of computer software by the Contractor, will the license transfer to the purchaser of the product under the same terms and conditions as set out in this article, provided that the purchaser has accepted these terms in writing.

18.5. The Contractor is not liable for any damage suffered by the Client as a result of an infringement of intellectual property rights of third parties.

18.6. The Client indemnifies the Contractor against any claims from third parties regarding infringement of intellectual property rights.


Article 19: Transfer of Rights or Obligations

The Client may not transfer or pledge any rights or obligations under these general terms and conditions or the underlying agreement(s) without prior written consent from the Contractor. This provision has proprietary effect.


Article 20: Termination or Cancellation of the Agreement

20.1. The Client is not entitled to terminate or cancel the agreement in whole or in part.

20.2. The Contractor may agree to a request for termination of the agreement. In this case, the Client will owe a fee of at least 20% of the agreed or estimated price. The Contractor may demand a higher fee or impose additional conditions for agreeing to the termination.


Article 21: Applicable Law and Competent Court

21.1. Dutch law applies. The Vienna Sales Convention (C.I.S.G.) or any other international agreement whose exclusion is allowed, does not apply.

21.2. The Dutch civil court that has jurisdiction in the Contractor’s place of establishment shall have exclusive jurisdiction over disputes arising from the agreement or related to it.

Additional terms and conditions for foundation works

In addition to the General Terms and Conditions issued by the Koninklijke Metaalunie, referred to as METAALUNIE TERMS, the General Terms and Conditions for the Execution of Foundation Works 2022 (AVAF 2022) also apply.

Article 1: UAV 2022

1.1. The declaration of these general terms and conditions also incorporates the Uniform Administrative Conditions for the Execution of Works and Technical Installations 2012 (UAV 2012), whereby the contractor is considered the contractor under UAV 2012, and the contracted work is referred to as “the work,” both as defined in § 1 paragraph 1 UAV 2012.

1.2. In the event of a conflict between these general terms and conditions and the UAV 2012, these general terms and conditions take precedence.

Article 2: Formation and Content of the Agreement

2.1. The agreement is concluded through acceptance of the contractor’s quotation or a written agreement. If the client does not dispute the accuracy of a written confirmation of an oral assignment within eight working days of receipt, both parties are bound by it.

2.2. Unless otherwise agreed, the drawings, technical specifications, and terms of the principal or client are not applicable.

2.3. Any work not explicitly mentioned in the agreement is not part of the scope.

2.4. Unless otherwise agreed, the following tasks and costs are borne by the client:

  • Value-added tax (VAT);
  • Arranging necessary traffic provisions, permits, and payment of local charges;
  • Insurance premiums;
  • Connection, disconnection, and usage costs for gas, water, and electricity;
  • Testing of materials, equipment, and tools at the client’s request (client bears these costs);
  • Conducting ground-related surveys, such as geotechnical, environmental, unexploded ordnance (UXO), and archaeological studies;
  • Drafting calculations and drawings;
  • (Height) measurements, survey work, and their maintenance during execution;
  • Excavation, demolition, cutting, bracing, and repair work on structures;
  • Welding and cutting operations;
  • Raising pile heads, walls, screens, and masses with ground improvements;
  • Groundworks, dewatering, and installing stabilizing structures for other constructions and surroundings;
  • Removing obstacles in, on, or above the ground that hinder execution or may cause damage;
  • Ensuring proper choices in the design phase per labor hygiene strategies when determining foundation techniques;
  • Measures to prevent noise pollution, damage, or inconvenience to the environment, adjacent properties, installations, data carriers, cables, pipelines, and paving;
  • Client’s commission fees;
  • Supervision during pile-driving, vibration, noise measurement, calendaring, load testing, acoustic measurements, and core drilling/testing;
  • Fencing and securing the construction site;
  • Providing waste containers and covering disposal costs;
  • Submitting a KLIC report, marking underground and overhead utilities, and complying with obligations under WIBON, BIBON, and CROW 500 guidelines;
  • Providing break and sanitary facilities compliant with labor law;
  • Drafting quality, safety, and inspection plans;
  • Any additional measures required under the Building Decree.

Article 3: Risk Provisions, Prices

3.1 The prices stated in the offer are based on the taxes, levies, wages, social security contributions, material and raw material prices, and other costs applicable on the date of the offer. If one or more of these cost categories change after the date of the offer, the contractor is entitled to adjust the agreed price accordingly.

3.2 If the contractor has provided unit prices as referred to in § 38 paragraph 1 jo § 39 UAV 2012, these shall only apply insofar as the work is carried out unchanged and the activities can be performed without alteration. If the method of execution changes, the activities will be settled according to § 36 UAV.

Article 4: Obligations of the Client

4.1 The client shall adequately inform the contractor about relevant specifications, pile plans, other documents, and knowledge originating from the principal or otherwise necessary for the execution of the work. If these documents are wholly or partially part of the agreement, these general terms and conditions shall prevail in case of a conflict. The client guarantees the accuracy and completeness of the information provided by them.

4.2 Without prejudice to the provisions of § 5 UAV 2012, the client shall also ensure that the contractor has timely access to relevant geotechnical, hydrological, archaeological, and NGE data, as well as information about soil contamination, old construction materials, and materials made available by the client. This also includes information about the structural condition of adjacent properties and known or foreseeable changes in work or site conditions. The client guarantees the accuracy and completeness of the information they provide.

4.3 The client is responsible for the orders and instructions given directly by the principal to the contractor concerning pile-driving supervision.

4.4 If construction meetings between the principal and the client are held without the contractor being present, the client must inform the contractor of matters discussed that relate to the contractor’s work. In such cases, the client shall provide the contractor with copies of relevant excerpts from the meeting minutes.

4.5 The client shall ensure that the contractor has all necessary approvals and permits before starting the work. The client is responsible for paying any levies and fees related to the use of the site or the execution of the (foundation) works.

4.6 The client shall provide safety and health facilities to comply with applicable laws and regulations.

4.7 The client shall take all necessary measures to prevent nuisance to the surroundings, damage to adjacent properties, and harm to the environment.

4.8 The client bears responsibility for the sequence of work prescribed by them or on their behalf, including specified pile systems, sheet pile profiles, and foundation techniques. This includes the effects of soil conditions, hydrological influences, or other prescribed circumstances, as well as for cables, pipelines, constructions, or underground obstacles. The client is also responsible for any incomplete or incorrect information that they are contractually obligated to provide and for orders and instructions given by them or on their behalf.

4.9 Without prejudice to other obligations, and contrary to § 5 paragraph 4 UAV 2012, the client guarantees the overall suitability of prescribed building materials and materials to be procured from prescribed suppliers unless the contractor had a choice regarding these materials.

Article 5: Construction Site

5.1 The client shall ensure good accessibility and passability of the construction site or, in the case of waterworks, navigability to and on the work site for transporting materials, equipment, and personnel, as well as for the execution of the contractor’s work. Costs for making the site suitable for the contractor’s work are borne by the client.

5.2 The construction site shall be adequately inspected and maintained by or on behalf of the client and, where necessary, restored to ensure sufficient load-bearing capacity for the duration of the contractor’s work. If required, a new site layout plan, including load-bearing calculations, shall be provided. The client shall comply with the most recent version of the “Construction Site Accessibility Guidelines” at the time of the assignment.

5.3 The client is responsible for the prior removal of above-ground obstacles that could hinder the contractor’s work or compromise its quality.

5.4 The client shall ensure adequate space around the contractor’s work site and equipment, including sufficient protection for adjacent work and third-party property. The client guarantees that safety zones, crane zones, and lifting areas comply with the latest version of the “Building and Demolition Safety Guidelines” at the time of the assignment. Any minimum required space will be agreed upon as needed.

5.5 The client shall provide sufficient parking spaces for the contractor, subcontractors, and employees free of charge.

5.6 The client shall provide and maintain suitable access routes from public roads to the construction and storage sites.

5.7 The client shall ensure adequate general lighting and direct lighting on the construction site to facilitate safe working conditions and ease of access for the contractor’s activities.

5.8 The client shall ensure the supply of sufficient electricity and water for the contractor’s work and at the work site.

5.9 The client is responsible for managing or redirecting road, rail, or water traffic, including installing, maintaining, and removing necessary traffic signs and measures.

5.10 The client shall provide break rooms and sanitary facilities for the contractor, in accordance with health and safety laws.

5.11 The client shall supply and maintain suitable and effective rescue equipment, including rescue boats and personnel, where necessary.

5.12 The contractor has the right to enclose their work site using fencing. Access to enclosed areas is exclusively permitted to the contractor.

5.13 The contractor is entitled to compensation and/or an extension of time if their work is delayed or if they incur damages due to the client’s failure to fulfill obligations under this article unless the costs or delays are attributable to the contractor.

Article 6: Soil

6.1 The client is responsible for the prior removal of underground obstacles that could adversely affect the contractor’s work or the quality of the work or cause damage to it. The client ensures the removal of (whether man-made or natural) obstacles (including archaeological objects) discovered during the execution of the work.

6.2 The client ensures an adequate provision for the removal, packaging, or protection against toxic or harmful materials encountered in the soil. If the contractor must take safety measures during the work due to encountering objects or substances as referred to in § 6 clause 16a UAV 2012, the resulting obligations or costs shall be reimbursed to the contractor as additional work.

6.3 The client ensures compliance with the obligations under the WIBON and BIBON and the CROW 500 guidelines. This includes arranging the KLIC notification and clearly marking or identifying the precise location of existing underground or above-ground obstacles, cables, and pipelines at the workplace. The client provides drawings indicating the exact position and level of these elements concerning the contractor’s work and ensures proper instructions are given to the contractor’s supervisor.

6.4 The contractor is entitled to compensation for costs and/or extension of time if the execution of the contractor’s work is delayed or if the contractor suffers any damage due to the client failing to meet their obligations under this article, unless the costs and/or delay are caused by circumstances attributable to the contractor.

Article 7: Commencement of Work; Execution Period

7.1 The client shall draw up a realistic schedule in consultation with the contractor. § 7 clause 1 UAV 2012 does not apply.

7.2 The client must make the construction site available on the first day of the agreed week in consultation with the contractor. The parties shall determine the exact start date within the agreed week.

7.3 If it is not possible for the contractor to start work in the agreed week, the client must notify the contractor as soon as possible, but no later than two weeks prior to the start date or as many working days as agreed upon by the parties before the scheduled start date.

7.4 If the work cannot start in the agreed week due to the client’s fault, a new start week must be agreed upon with the contractor that fits within the contractor’s schedule.

7.5 If the commencement or progress of the assigned work is delayed due to force majeure, circumstances attributable to the client, changes to the agreement, or execution conditions, the resulting damage incurred by the contractor shall be compensated by the client.

7.6 The client shall compensate the contractor for delay costs, business damages, and consequential damages caused by the client’s or third parties’ failure to perform their duties or supply materials properly, or due to other circumstances attributable to the client.

7.7 Force majeure refers to any cause beyond the contractor’s control and not attributable to the contractor that prevents the fulfillment of obligations. Force majeure includes, but is not limited to, abnormally high or low water levels, ice, unworkable weather, strikes, riots, disturbances, and delays caused by work or deliveries to be performed by the client or third parties outside the contractor’s responsibility.

7.8 If the contractor is hindered in fulfilling the agreement due to changed circumstances, force majeure, or suspension of work, they have the right to adjust the execution of the agreement while considering the client’s legitimate interests.

7.9 Notwithstanding § 14 UAV 2012, modifications to execution due to the circumstances mentioned in Article 7.8 will be settled as additional or reduced work.

Article 8: Insurance

8.1 Contrary to § 43b clause 1 UAV 2012, the client shall insure the work from the commencement until the end of the maintenance period (if agreed upon), or at least until delivery, through a CAR insurance or Liability Insurance, against all material damage, loss, or destruction for any cause, setting aside Article 951 and, if necessary, Article 932 of Book 7 BW. This insurance must cover costs of cleanup, repair, or replacement. The contractor must be co-insured under this policy without restrictive conditions, providing primary coverage with insurers waiving rights of recourse against any other contractor policies.

8.2 The CAR policy shall specify that any indemnity for damages shall be paid to the rightful owner. The contractor’s deductible liability per incident cannot exceed 1% of the contract sum.

8.3 The insurance must follow the Dutch Construction and Assembly Works Insurance Policy (NBBM 2013) or Liability Insurance standards and include at least:

  • Damage resulting from loss and/or material damage to (part of) the work, auxiliary works, materials, and structures.
  • Liability for damage related to work execution, including damage from WAM-required work equipment.
  • Material damage or loss of the principal’s property caused by work activities.

8.4 If a sheet pile clause or in-ground pole clause applies and the contractor acted as a reasonably competent professional, the client remains liable for financial damages or repairs.

8.5 The client must ensure all parties involved in executing the work and their employees are considered third parties under the policy.

8.6 The client must provide the policy, general terms, and clauses before the work begins and prove coverage upon the contractor’s request.

8.7 Under no circumstances will the client or their employees be co-insured under the contractor’s policies.

8.8 The client indemnifies the contractor for claims not covered by the CAR insurance due to the client’s failure to meet obligations under this article.

Article 9: Liability of Parties

9.1 If the contractor fails to fulfill their obligations and the client issues a notice of default, this notice must be made in writing, granting the contractor a reasonable period to comply with their obligations.

9.2 The contractor accepts no liability:
a. for defects in piles and (sheet) walls, unless caused by gross negligence and duly reported in writing by the client;
b. for damage to structures, underground and aboveground cables, pipes, conduits, culverts, sewers, etc., unless the client has sufficiently informed the contractor about their location through drawings, and the actual locations align with the provided information;
c. for damage resulting from design errors, unless explicitly stated in the agreement that the contractor is responsible for the design of the entire project or the specific part in which the error occurred;
d. for damage caused by vibrations and/or settlements to adjacent properties, structures, underground and aboveground cables, pipes, conduits, culverts, sewers, etc., unless such damage is due to intent or gross negligence.

9.3 The contractor’s obligation to pay compensation, regardless of the basis, is always limited to the contract sum.

9.4 Notwithstanding the provisions of Article 9.3, the contractor’s obligation to pay compensation is limited to the amount covered by the CAR insurance, WAM insurance, or AVB insurance taken out by or (partly) on behalf of the contractor.

9.5 If, for any reason, the insurances mentioned in Article 9.4 do not cover claims for damages against the contractor, the contractor’s liability is limited to 10% of the contract sum, with a maximum of €225,000.

9.6 In the situation described in Article 9.5, damage to the work as defined in § 44 clause 1 UAV 2012 is deemed to be at the client’s expense, unless the damage is attributable to the contractor.

9.7 In the situation described in Article 9.5, the contractor accepts no liability for damage to works related to the project or to other works and properties of the client or third parties, unless the damage was caused by the execution of the work and is attributable to intent or gross negligence on the part of the contractor, their personnel, subcontractors, or suppliers.

9.8 The client indemnifies the contractor against all claims from third parties for damages for which the contractor is not liable under the agreement between the client and the contractor.

Article 10: Delivery

10.1 The contractor will notify the client when the work is, in their opinion, completed. Submission of a final payment request or final invoice is considered notification that the corresponding work is complete.

10.2 Following the completion notification, the client will inspect the work and inform the contractor whether the work is approved, potentially listing any remaining points to be addressed.

10.3 The work is deemed delivered when approved by the client or if the client does not notify the contractor in writing within fourteen days after the date of the contractor’s completion notification that the work is not approved. The work is also deemed delivered if the client puts it into use, including further work performed on it by the client.

10.4 The date of delivery is the date on which the contractor notified the client that the work was completed, provided the work can subsequently be deemed delivered under Article 10.3.

Article 11: Retention of Title

11.1 Until full payment under the agreement is made by the client, all delivered materials remain the responsibility and risk of the client and remain, whether processed or unprocessed, the property of the contractor.

11.2 This retention of title also extends to materials already paid for by the client if other materials delivered by the contractor, including later deliveries, remain unpaid.

Article 12: Disputes

12.1 Unless otherwise agreed in the contract, all disputes—including those recognized as such by only one party—arising from the agreement or subsequent agreements between the client and contractor shall be resolved through arbitration in accordance with the rules of the Dutch Arbitration Board for the Construction Industry as they apply on the date of the assignment or confirmation.

12.2 The contractor reserves the right, instead of invoking the dispute resolution procedure in Article 12.1, to bring a dispute before the competent court in the contractor’s district.

12.3 If any provision of these terms is deemed invalid or unreasonable by a court or arbitrator, it will be considered revised to align as closely as possible with its original intent and meaning without being classified as invalid or unreasonable.

Filed at the Registry of the Midden Nederland District Court on April 7, 2022, under number 22-58.